Poland’s Dreamliners grounded through October

  • Posted: Friday, February 15, 2013 12:01 a.m.
  • Text size: A A A

Polish airline LOT said Thursday it is keeping its Boeing 787 Dreamliners grounded through October while the U.S. company tries to solve a potential safety threat.

The late date suggests that some airlines are growing skeptical about the plane’s chances of resuming flight soon.

The world’s total fleet of 50 787s has been grounded since Jan. 16 as Boeing and investigators try to figure out why one aircraft battery caught fire and another smoldered, forced an emergency landing. Each 787 has two lithium ion batteries.

Recent test flights performed in search of the root cause of battery ignition were carried out with no incidents.

The planes are made in North Charleston and Everett Wash., which assembled LOT’s Dreamliners.

LOT President Sebastian Mikosz said he could not schedule his airline’s two 787s for summer-season flights as long as the cause of the technical problems has not been determined and the U.S. aviation authorities’ order to keep them grounded remains in force.

The decision is “the result of uncertainlty,” said LOT spokesman Marek Klucinski said. “We want to carry our passangers in a forseeable and safe way.”

The decision is a blow to Poland’s national carrier, which is cutting costs and planning mass layoffs in an effort to survive.

LOT is Europe’s first airline to have Dreamliners, which it had hoped would improve its financial results and position.

It also shows carriers are preparing for their 787s to be grounded for an extended period of time.

Japan Airlines, which had one of its 787 suffer a battery fire while parked at Boston’s Logan International Airport last month, has said its fleet of six Dreamliners will remain idled through March. The other troubled 787, which was forced to make an emergency landing on Jan.16 in Japan due to a smoldering battery, belongs to All Nippon Airways, which is not flying its Dreamliners either.

In Europe, Norwegian Air Shuttle has been warned by Boeing of possible delays in the deliveries of its first 787 aircraft scheduled for April and June. Boeing also suspended delivery of three more 787s planned for LOT this year.

For Poland’s LOT, the grounding means it will need to extend a lease on three Boeings 767s it currently uses and lease another two for the summer season, Klucinski said.

He added LOT is also talking to Boeing about the costs generated by the idling.

One of LOT’s Dreamliners remains in Chicago, the other in Warsaw. Both are safe to fly, Klucinski said.

The 787, dubbed the Dreamliner by Boeing, is the first airliner to make extensive use of lithium ion batteries, which are lighter weight, charge faster and contain more energy than conventional batteries similar in size.

Comments { }

Postandcourier.com is pleased to offer readers the enhanced ability to comment on stories. We expect our readers to engage in lively, yet civil discourse. Postandcourier.com does not edit user submitted statements and we cannot promise that readers will not occasionally find offensive or inaccurate comments posted in the comments area. Responsibility for the statements posted lies with the person submitting the comment, not postandcourier.com. If you find a comment that is objectionable, please click "report abuse" and we will review it for possible removal. Please be reminded, however, that in accordance with our Terms of Use and federal law, we are under no obligation to remove any third party comments posted on our website. Read our full Terms and Conditions.